Drilling on the South side of the Strait was finished on March 29th. Twelve borings were drilled for Tower #2 with six borings each for the West and East sides of the tower. Rock coring occured in each of the twelve holes below the overlain soils and Bay mud. The twelve borings were each drilled at the center of the proposed pile locations for the South tower. These piles will provide support for the Bridge structure. Click here for a plan view of the bridge.

Below are some of the pictures taken while out drilling the first twelve holes...

Drilling Boring-1 at Tower 2 West.
Drilling at Boring-1
Drilling Boring-4 at Tower 2 West.
Drilling at Boring-4
Drilling Boring-4 at Tower 2 West.
Boring-4 facing South
Carquinez Bridge view from barge at Tower 2 West.
View of Bridge
Drilling Boring-4 at Tower 2 West.
Boring-4 Facing North
Drilling Boring-4 at Tower 2 West.
Boring-4 Facing North
Drilling Boring-4 at Tower 2 West.
Drilling at Boring-4
Drilling Boring-4 at Tower 2 West.
Drilling at Boring-4
Minor Repairs on Rig.
Making some minor repairs
Drilling Boring-4 at Tower 2 West.
Drilling at Boring-4
Andy Taber, Steve Taber and J.R.
Andy Taber visiting the Barge
View from Barge... Ship passing under Carquinez Bridge.
View of Bridge
View from Barge... Ship passing under Carquinez Bridge.
View of Ship and Bridge
View from Barge... Ship passing under Carquinez Bridge.
View of Ship and Bridge
Drilling Boring-9 at Tower 2 East.
Drilling at Boring-9
Drilling at Tower 2 West.
Drilling at Tower 2 West
Drilling at Tower 2 West.
Drilling at Tower 2 West
Sunset from the West side of barge at the Tower 2 West.
Sunset from Tower 2 West.
Steve Leslie, driller.
Drilling Boring-10
Drilling Boring-10 at the Carquinez Bridge.
View of Carquinez
Drilling Boring-10 at Tower 2 East.
Drilling at Boring-10
Drilling at Tower 2 West.
Drilling at Tower 2 West
Drilling at Tower 2 West.
Drilling at Tower 2 West